BANAMIND

TRACK REAL PROGRESS

AI Construction Progress Tracking Software

Stop guessing percentages. Banamind is construction progress tracking software that structures your project into phases and tasks, calculates real progress backed by evidence from the field — and shows you exactly where things stand.

AI task generation

Generate structured phases and tasks from your project scope.

Progress %

Weighted completion percentage by project, phase, and zone.

Task evidence

Photos, videos, and documents attached directly to each task.

Risk detection

Tasks with no updates or missing evidence flagged automatically.

Why It Matters

One number everyone agrees on.

The PM thinks the second floor is 60% done. The foreman says 80%. The owner has no idea. Banamind replaces guesswork with structured tasks organized into phases — each with a weight, status, and linked evidence. Progress percentage is calculated from real data, not gut feeling.

HOW IT WORKS

FROM SCOPE TO PROGRESS —
AUTOMATICALLY

Banamind turns your project scope into structured phases, weighted tasks, and real-time progress — calculated from evidence captured in WhatsApp, not guesswork.

Phases and tasks AI dashboard

AI-POWERED SETUP

Generate phases and tasks with AI

Describe your project scope — Banamind generates a full structure: phases, tasks, and subtasks, broken down by zones and work types. AI gives you the starting point; you shape the final plan.

AI-generatedPhases & tasksScope to plan
A
0:12

"Villa 12, we need foundation, structure, MEP, and finishing. Start with excavation and rebar."

8:41 AM

✓ Project "Villa 12" created with 4 phases and 14 tasks.

Foundation — 4 tasks
Structure — 3 tasks
MEP — 4 tasks
Finishing — 3 tasks
8:42 AM

Here's your project checklist:

app.banamind.com/villa-12/checklist

Review and adjust phases, weights, and assignees in the dashboard.

8:42 AM

TASK MANAGEMENT

Full control over every task

Each task has a description, due date, assignee, status, tags, and subtasks. Assign a responsible person, set priorities, break work into smaller steps. Edit, reorder, or add tasks anytime — the structure stays yours, whether AI created it or you built it from scratch.

Task managementProgress %Drag & drop
Full control over every task

EVIDENCE GATE

Require evidence to complete a task

For tasks that matter most, turn on evidence requirements — the task can't be closed until a confirming photo or video is uploaded. You decide which tasks need proof and which don't. When enabled, the team sends media through WhatsApp and Banamind links it to the task automatically. Simple tasks close freely; critical ones stay open until the evidence is there.

AI agentPhoto evidenceEvidence gate

Hi Ahmed, task "Tiling — Zone B" needs a photo of the finished surface. Please send it here.

9:14 AM
A
Tiling photo 1Tiling photo 2
9:17 AM

✓ Evidence received and linked to task "Tiling — Zone B"

9:17 AM

REAL-TIME METRICS

See real progress, not gut feeling

Each task has a relative weight in the overall progress. As tasks get completed and evidence is attached, Banamind calculates approximate progress percentage — by entire project, by phase, and by zone. One dashboard, one truth.

Real-time metricsCompletion %Dashboard view
Marina Bay Residences
72%
Foundation
Structure
MEP
Finishing
11/15 completed tasks
Downtown Office Tower
33%
Foundation
Structure
MEP
Finishing
5/15 completed tasks
Al Reem Island Villa
91%
Foundation
Structure
MEP
Finishing
14/15 completed tasks

EARLY WARNINGS

Spot the risk before it's a problem

Banamind flags tasks that have no recent updates, lack supporting evidence, or have been stuck in the same status for too long. You see risks while they're still small — not when the client asks and you have nothing to show.

Risk signalsEarly alertsTrend analysis
HVAC1 of 2 subtasks
12d idle
Check equipment calibration
Prepare documentation
Concrete
OK
Electrical
No proof
Framing
New
Waterproofing1 of 1 subtasks
3w stale
Alarm
OK
Plumbing
New
Testimonials

Built for every
role on your team

"I open the dashboard for 30 seconds and know exactly where all my projects stand. If something's off — delays, missing evidence, budget risk — I see it immediately."

Marco R.

Marco R.

Owner / Director

"I used to spend half my day chasing status updates. Now progress comes to me automatically. Reports that took me 3 hours now take 10 minutes."

Sarah K.

Sarah K.

Project Manager

"Finding the right photos used to mean scrolling through weeks of WhatsApp. Now I search by date, stage, or zone and have everything in seconds."

Li Wei

Li Wei

Office Administrator

"Nothing changed for me — I keep sending photos in WhatsApp like I always did. The system picks it up automatically, no new app needed."

James D.

James D.

Site Foreman

Join industry leaders and doubled their efficiency and client trust

Built for and used by the biggest brands in the industry.

+15%REVENUE

Pro Builders

boosted revenue by 15% through superior build quality.

x2RETENTION

AHC

doubled their repeat client rate by sending automated progress reports.

50.000$SAVED

Reliant Roofing

saved $50k a year by using time-stamped visual proof.

15h/weekSAVED

BK Restoration

saves 15 hours every week by replacing manual coordination with automated tools.

FAQ

Construction Progress Tracking: Frequently Asked Questions

TRY BANAMIND
WITH YOUR TEAM

See Pricing